Data Center Migration
Overview
Data center migration, in the AI infrastructure context, refers to the large-scale geographic relocation of hyperscale AI training facilities away from traditional urban data center clusters (which historically co-located with fiber networks and enterprise customers) toward less-populated, lower-cost-energy inland regions. The primary driver is power cost and availability: AI training clusters at the 50,000–100,000 GPU scale consume tens of megawatts to gigawatts of power, making energy price per kWh a dominant cost variable that overwhelms real estate and connectivity cost considerations.
The consequence is explosive growth in WAN traffic: as compute moves further from end users and across geographies, AI-generated traffic traversing long-haul networks increases dramatically. This simultaneously validates the scale-across network tier requirement (connecting distributed clusters) and increases the relative importance of wide-area networking quality for AI workloads.
Meta's planned Hyperion data center — up to 5 GW in planned capacity, roughly the size of Manhattan — was cited at OCP Global Summit 2025 as an example of the emerging scale of AI training infrastructure that cannot fit within traditional urban data center footprints.
Sign in to read the full article.
Sign In