Ning Liu, Product Manager at Envicool, presented the company's full-chain liquid cooling strategy and 2 GW+ deployment track record at the 2025 OCP Global Summit in San Jose. The talk covers Envicool's 20-year history, its three-pillar 'full-chain' framework (ecosystem integration, application scenarios, lifecycle management), and detailed product specifications ranging from in-row CDUs (300 kW–2.5 MW) to manifolds, secondary piping, load banks, and production-line automation tools. A central theme is the industry's transition to mandatory liquid cooling as rack densities surpass 120 kW and approach a projected 1 MW per rack by 2027.

Key Takeaways

Sign in to read the full article.

Sign In