LITEON Technology's Bob Weng presented the company's GPU power solutions roadmap at OCP Global Summit 2025, tracing the evolution from 3 kW embedded server PSUs (2017) through 33 kW GB300 power shelves to a next-generation 1.2 MW 800 VDC power rack targeting early 2026 delivery. The presentation centered on LITEON's power smoothing innovation: bulk capacitor increases of ~40% combined with digital PFC firmware that screens GPU dynamic load transients from propagating to the AC facility side. LITEON positioned itself as a consistent supplier across three GPU generations simultaneously, from Hopper through Blackwell NVL72.

Key Takeaways

Sign in to read the full article.

Sign In